Turbines, Generators and Associated Plant

Turbines, Generators and Associated Plant

4.11 - 1251 ratings - Source

The introduction of new 500 MW and 660 MW turbine generator plant in nuclear, coal- and oil-fired power stations has been partly responsible for the increase in generating capacity of the CEGB over the last 30 years. This volume provides a detailed account of experience gained in the development, design, manufacture, operation and testing of large turbine-generators in the last 20 years. With the advance in analytical and computational techniques, the application of this experience to future design and operation of large turbine-generator plant will be of great value to engineers in the industry.To permit on-load maintenance of the leak-off system, sufficient manual isolating valves are included and any parts ... CEGB specifications require that the 100% main boiler feed pump is tested at a load corresponding to turbine MCR to prove anbsp;...

Title:Turbines, Generators and Associated Plant
Author:D.J. Littler
Publisher:Elsevier - 2013-10-22


You Must CONTINUE and create a free account to access unlimited downloads & streaming