Japanese Railway Engineering

Japanese Railway Engineering

4.11 - 1251 ratings - Source

Passenger Control Function (1) Diagram control function PGC handles the following three diagrams: (1) Train Control ... Moving-up of a train originally to be started later is done at the station terminal set of PGC, which handles moving up based ... (vii) Message A message input from the PGC station terminal set is displayed.

Title:Japanese Railway Engineering
Publisher: - 1993


You Must CONTINUE and create a free account to access unlimited downloads & streaming