Construction Manual

Construction Manual

4.11 - 1251 ratings - Source

Although the weather may be suitable, the grade may still be too wet to work, and a non-working day would be the proper decision. b. ... Upon receipt of a letter from the Contractor requesting a time extension, the Resident Engineer will acknowledge such receipt by a ... with a cover letter containing the following information: (1) Number of days being requested and Contractora#39;s justification of the request.

Title:Construction Manual
Author:California. Dept. of Transportation. Division of Facilities Construction